Pile Breakback is a Cost Problem.
Traditional pile breakback is one of the most labour-intensive and time-consuming stages of piling.
It slows production, increases labour costs and introduces variability that impacts the overall programme.
This is where projects lose time, money and control.
Edlietech was designed to solve this.
International Patent Pending Technology.
A practical, site ready solution to reduce labour, improve safety and accelerate pile breakback at cutoff level.
Built from real site experience, the Edlietech system is designed to improve one of the most labour-intensive and high-risk stages of piling.
It delivers a safer, faster and more controlled approach to breakback — reducing variability, labour requirements and time on site.
More control. Less time. Lower cost.
How It Works.
A simple, controlled approach to pile breakback built into the piling process.
Built from experience.
Edlietech was developed after years working on major civil construction projects and seeing firsthand the time, labour and risk involved in traditional pile breakback.
Built on site. Designed to reduce cost where it matters.
Turn breakback into a controlled, predictable process.
Weak Point Created
Engineered break point at cut-off level
Risk.
High exposure to dust and close-contact work increases safety risk.
Labour.
High manual labour requirements drive up cost per pile.
Time.
Slow breakback impacts programme and delays progress.
Variability.
Inconsistent results lead to rework and inefficiency.
Safer.
Reduces close-contact work and exposure to dust.
Faster.
Accelerates breakback and keeps the job moving.
More Predictable.
Delivers consistent results at cut-off level.
Lower Cost.
Reduces labour requirements and overall breakback costs.
Built for real site conditions.
Designed to reduce cost where it matters.
Installed.
The Edlietech system is installed on the cage prior to the concrete pour.
Cast.
The concrete is poured and sets around the cage, with the Edlietech system creating a controlled weak point at cut-off level.
Break.
A machine-mounted hammer creates the break at the engineered weak point.
Reduced.
A cleaner, more predictable break is achieved with reduced labour and time.
Controlled Break
Machine breaks cleanly at the weak point
Built from experience.
Edlietech was developed after years working on major civil construction projects and seeing firsthand the time, labour and risk involved in traditional pile breakback.
Built on site. Designed to reduce cost where it matters.
Ready To Trial Edlietech On Your Next Project?
Individual pile trials are complete.
Edlietech is now moving to project scale validation with selected partners.
Now Seeking Trial Partners.
We’re looking to work with piling contractors and project teams focused on reducing labour, time and cost during pile breakback.
Trial focus:
Labour Reduction
Time Saving
Breakback Consistancy
Programme Impact
Site Practicality